RFQ No.: RFQ #051/2026
Reference No.: PR#328/26
Buyer: General Petroleum Company C/O Scimitar Production Egypt Ltd.
Location: Cairo, Egypt
Published Date: 10 June 2026
Closing Date: 18 June 2026
Closing Time: 12:00 PM
Time Zone: Cairo Time, UTC+2
1. Procurement Scope
Scimitar Production Egypt Ltd. invites qualified suppliers to submit quotations for the supply of Heavy Oil Pump, quantity 5 sets.
Item Description:
HEAVY OIL PUMP 89-70/38TH5.6/1.2-0.9/5.1PZ
Stroke Length: 4m
2 3/4” × 1 1/2”
For 3.5” TBG
Code: 30-275/150PF
Quantity: 5 EA / 5 Sets
2. Technical Requirements
The offered products shall comply with the RFQ documents and attached technical information.
Key reference requirements include:
- Product type: Heavy Oil Pump
- Application: Oilfield workover operations, downhole pumping system, heavy oil production
- Reference model: 89-70/38TH5.6/1.2-0.9/5.1PZ
- Stroke length: 4m
- Tubing: 3.5” TBG
- Code: 30-275/150PF
- The technical attachment includes pump structure, parts list, catalogue information and drawings. Suppliers shall quote according to the attached technical specifications.
3. Quotation Requirements
Suppliers are requested to provide the following information in their quotation:
- Unit price and total price;
- Shortest delivery lead time;
- Brand, model and country of origin;
- Technical deviations, if any;
- Offer validity of at least 90 days;
- Quotation must be issued on the supplier’s official letterhead and stamped;
- All correspondence shall refer to SPEL-26-051.
4. Commercial Terms and Conditions
- Offer validity: 90 days;
- Delivery lead time: Shortest possible lead time;
- Country of origin: All origins are accepted;
- Packing: Bare in bundle or as per manufacturer’s recommendation;
- Payment terms: 45 days after receipt of supplier invoice and goods received at SPEL warehouse and accepted by the technical engineer;
- Price basis: Prices shall remain firm and fixed during purchase order execution;
- Quantity adjustment: Scimitar reserves the right to increase or decrease the quantity according to its needs;
- Delay penalty: 1% per week or part of week on delayed materials, up to a maximum of 5% of the total purchase order value;
- Inspection: Materials shall be subject to inspection if applicable.
Cotizar
La información sobre licitaciones de esta plataforma procede de los documentos presentados por los compradores y se ofrece únicamente como referencia para la conexión entre la oferta y la demanda de productos industriales; no constituye ningún compromiso, garantía ni aval en relación con la licitación. Antes de presentar una oferta, se recomienda verificar directamente con el licitador la veracidad, exactitud y validez de la información esencial, como los detalles de los requisitos, los requisitos de cualificación y los plazos de presentación. Esta plataforma se reserva el derecho a modificar o retirar la información, y no asume ninguna responsabilidad legal por las pérdidas que pueda ocasionar el uso de dicha información.